Muhlenberg College
Installation of the HVAC, plumbing, laboratory gases, Web-based automatic temperature controls system and NEBB-certified balancing for the new LEED-certified science building addition and renovation of the existing Shankweiler Building.
Installation of the HVAC systems, including automatic temperature controls and NEBB-certified balancing, for the addition and renovations to the existing Seegers Student Union
Design and construction of the new HVAC, plumbing and laboratory gas systems in the existing Trumbower Science Building, including laboratory control systems and energy recovery
Design and construction of the new 1,800 ton central chilled water plant and campus underground distribution system
Design and installation of the HVAC, plumbing and automatic temperature control systems for the new 3-story athletic addition, including heat recovery
Design and installation of the HVAC and plumbing systems for the two new, four-story student housing buildings totaling 65,000 square feet
Installation of the HVAC, plumbing and automatic temperature control systems for the new multi-story Moyer Hall academic building
Installation of the HVAC, plumbing and automatic temperature control systems for the Trexler Pavilion Performing Arts Center including a 400-seat theater
