Olympus Corporation of the Americas Headquarters
Our staff assisted the design professional team in the development of the system concepts and construction drawings for the new 330,000 square foot corporate campus. Self-performed the fabrication and installation of the HVAC systems including a 800 ton central utility plant; under-floor air distribution systems; data center cooling systems; Web-based automatic temperature controls system; and NEBB-certified air and hydronic balancing.
