H.T. Lyons - contractors | engineers

Visit Our Other Companies

Westech Process Solutions

Penn’s Peak

Prime contract to design and construct a two-story expansion, select renovations and complete replacement of the building HVAC systems. The unique mechanical system incorporates exposed, perforated, spiral duct in the performance hall and restaurant that was designed to comply with the acoustic requirements of those spaces.

 
 
Close Window

Main Office: 7165 Ambassador Drive Allentown, PA 18106
Phone: 610.530.2600 | Fax: 610.530.2635

* All fields required