Lehigh Valley Health Network
Cedar Crest Campus
- Kasych Pavilion – Installation of the HVAC, plumbing and medical gas systems, and the automatic temperature controls and balancing for the seven-story, 327,000 square foot, LEED-certified, addition and 223,000 square foot renovation including 120 private medical / surgical patient rooms, 6 operating rooms, ICU, Burn Unit, Kitchen / Cafeteria, Morgue, OHU / TOHU, Pre-Op, PACU and the replacement of 3 – 800 ton fire-tube boilers and the 400 ton, low temperature Operating Room Suite water-cooled chiller
- Emergency Department renovation and expansion – Installation of the HVAC, plumbing and medical gas systems
- Medical office building fit-out – Installation of the HVAC systems
- Pedestrian bridge – Installation of the HVAC and plumbing systems
- 3 parking structures – Installation of the HVAC and plumbing systems
- Replacement of two, 1,000 ton chillers
- Regional Cardiac Center – Installation of HVAC systems for the 59,000 square foot, multi-phase renovation and addition including the construction of 7 cardiac catherization labs
- Jaindl Pavilion – Installation of the HVAC, plumbing and medical gas systems, and the automatic temperature controls and balancing for the five-story, 250,000 square foot addition
- Morgan Cancer Center / Medical Office Building – Installation of the HVAC, plumbing and medical gas systems for the five-story, 250,000 square foot addition
Muhlenberg Campus
- Muhlenberg Campus Addition
- Installation of the HVAC, plumbing and medical gas systems for the seven-story, 265,000 square foot addition
- Installation of the HVAC systems for the new Central Utility Building, including 1,300 ton chiller plant and 500 horsepower hot water boiler plant
17th Street Campus
- Central chilled water plant – Relocation and expansion of the 1,800 ton central chilled water plant