Pharmaceutical / Medical Space
sanofi Pasteur
Prime contract to design and construct a new 18,000 square foot central utility plant using an alternate project delivery system – Design.Build.Operate.Maintain. The infrastructure includes a 9,000 ton chilled water plant; 4,000 boiler horsepower steam plant; Web-based automatic temperature and energy management system; and underground utility tunnel distribution system. H. T. Lyons operates and maintains the equipment and controls system twenty-four hours a day, seven days a week
High purity process piping, HVAC systems and vessel / equipment modifications in a cGMP space for meningitis vaccine production, including the installation of autoclaves, process tanks, heat exchangers and pump skids
Installation of HVAC and laboratory ventilation systems and mechanical and process piping, including laboratory gases, laboratory waste, process glycol, clean steam, as well as heat exchangers, pumps and tanks for the construction of a multi-phase Vaccine Development Laboratory
B.Braun
Installation of HVAC, plumbing and process piping systems and automatic temperature controls and NEBB-certified balancing for a new 2-story Injection Molding Addition and OEM manufacturing addition
Fisher Clinical Services
Design / build, prime contract for 12,000 square foot, Class 100,000 clean room manufacturing and packaging space
DSM Nutritional Products
In-plant process piping and ventilation system projects
Amerisource Bergen
Installation of mechanical systems for a new, conditioned 300,000 square foot pharmaceutical distribution facility, including a 1,200 ton central chiller plant