Commercial
Agere Systems Headquarters (LSI)
Installation of the HVAC systems in the new 3-story, 500,000 square foot corporate campus, including a 3,000 ton central chilled… Read More
Arts Quest Steel Stacks
Installation of HVAC systems for new four-story venue on the former site of Bethlehem Steel
Bear Creek Mountain Resort
Design and installation of HVAC and automatic temperature control systems for the new 58,000 square foot lodge and 8-story hotel… Read More
DaVinci Science Center
Design and construction of the HVAC systems utilizing variable air volume with demand control ventilation and high efficiency boilers
Dun & Bradstreet
Design and installation of the HVAC and automatic temperature control systems for the new 3-story, 180,000 square foot Energy Star… Read More
Great Wolf Water Park
Installation of 44,000 feet of pool piping and 56 pumps for the indoor water park including slides, wave pool, lazy… Read More
Liberty Property Trust
Design and installation of HVAC systems for new 3-story, 95,000 square foot Class A, LEED Silver-certified office building
Mack Trucks
Design and installation of the HVAC and plumbing systems in the new 2-story, 37,000 square foot Engineering, Design and Test… Read More
Olympus Corporation of the Americas Headquarters
Our staff assisted the design professional team in the development of the system concepts and construction drawings for the new… Read More
Penn’s Peak
Prime contract to design and construct a two-story expansion, select renovations and complete replacement of the building HVAC systems. … Read More
PenTeleData
Installation of computer room systems and HVAC system in internet service center
Rodale Aquatic Center
Design and installation of the HVAC systems for the new multi-pool natatorium, including energy recovery and pool water heating
Rodale Press Book Division
Installation of HVAC, plumbing and automatic temperature control systems for the new 2-story building, including thermal storage
Sands Casino Resort Bethlehem
Fabrication and installation of the new casino and support areas mechanical systems including a 6,000 ton chilled water and 2,400… Read More
sanofi Pasteur
Installation of HVAC and plumbing systems for new 3-story, 145,000 square foot office building
TEK Park
Installation of HVAC system for 80,000 square foot tenant fit-out
The Plaza at PPL Center
Design and construction services of the mechanical, electrical, plumbing, and fire protection systems for the new LEED-Gold, Energy Star, eight-story,… Read More
Voicestream
Installation of HVAC systems in the 108,000 square foot call center
