H.T. Lyons - contractors | engineers

K-12

Lakeland School District

Design and installation of new heat recovery rooftop equipment, duct distribution and lighting retrofit for the High School and Elementary… Read More

Old Forge School District

Modifications to the exiting Johnson Controls Metasys automatic temperature control system for a school ventilation system

St. Thomas More

Installation of HVAC and plumbing systems for the new 2-story, 19,000 square foot elementary school addition

Weatherly School District

Upgrade of the existing HVAC and automatic temperature control systems, lighting retrofit and window replacement

 
 
Close Window

Allentown Office: 7165 Ambassador Drive Allentown, PA 18106
Phone: 610.530.2600 | Fax: 610.530.2635
Scranton Office: 600 Larch Street Scranton, PA 18509
Phone: 800.367.7099 | Fax: 570.348.1005

* All fields required